Accurate error estimates can be calculated with at least 4 GCPs,while often at least 5 are needed to cover the center of the project as well,which reduces the chance of error propagation and resulting terrain distortions especially on flat or undulating terrain types.
Accurate error estimates can be calculated with at least 4 GCPs,while often at least 5 are needed to cover the center of the project as well,which reduces the chance of error propagation and resulting terrain distortions especially on flat or undulating terrain types.
英语人气:329 ℃时间:2020-04-20 05:35:00
优质解答
用至少4个地面控制点可以计算出准确的误差估计,而通常至少需要5个地面控制点以同时覆盖项目的中心区域,这样可减少误差传播从而导致地形失真的几率,尤其是在平坦或起伏的地形类型上.