Terms and conditions:条款:
1.Delivery date:delivered to freight forwarder's warehouse by October 26,2009(cutoff) to meet November 2,2009 sailing date.FOB Shenzhen.Vendor will be responsible to pay for Chinese Customs clearance,trucking to the forwarder's warehouse and all origin fees including,where applicable,commodity inspection,exit inspection,A.M.S.&fees as charged by the forwarder
1.发货日期:在2009.10.26(不包括10.26)之前发货到货运代理的仓库,开航日期为2009.11.02.深圳离岸.卖方负责支付中国的海关结关费用,发货至货代仓库的运费以及一切源头费用,包括合理的商品检验、出口检查,A.M.S.费用以及其他货运代理的收费.
2.Payment term:30%deposit after pps approval,balance before delivery
2.支付条款:pps通过后支付30%的定金,在发货前支付剩余货款
4.inspection certificate issued and signed by our authorized personnel is required.
4.需要我方权威人士签署出具的检查证明.
5.production can not start until pre-production samples are approved.
5.只有当试制品通过审核后,才能开始正式生产.
6.Quality Standards:
The vendor is responsible for the quality of products,and our random sample inspection does not release the vendor's responsibility to meet the quality standard we set out.The vendor is responsible for any costs,fee or change incurred as a result of inferior products.The vendor also agrees to use lead free and non-hazardous material for the production of products and lead free paint/ink for imprints and decoration of the product during production.We reserve the right to engage a third party testing company to verify if such practice is maintained in mass production and that the product is safe and meets USA ASTM standards and requirements .** will appoint third party testing company to conduct tests.
6.质量标准:卖方对产品的质量负责,就算已经通过我方的随机抽样检查,卖方仍需要对我方制定的产品质量标准负责.由次品导致的一切成分费用或变更应由卖方负责.在生产环节,卖方要同意使用无铅的安全原材料进行产品生产,产品上的标记必须使用无铅的颜料/墨水.我方保留雇佣第三方检测公司的权利,第三方检测公司将核实在大规模生产中卖方是否按规定执行以及产品是否安全并且符合美国材料试验协会(ASTM)制定的标准和要求.**将指定第三方检测公司执行检测.
7.Vendor is responsible to get goods ready and ensure quality compliance for inspection.if goods is rejected due to non-compliance,we will charge$250USD for each additional inspection,and the charge will be deducted from the payment of goods.
7.卖方负责准备好产品,并确保产品质量通过检验.如果因为不符合规定导致产品被拒,我方将收取250美元每次的追加检验费,该收费将从应支付的货款中扣除.
8.The vendor is to ensure shipment will be made per delivery date committed above,and will be held responsible for any cost,fee or charge incurred directly or indirectly due to delay of shipment caused by the vendor.
8.卖方必须确保货物依据上方规定的时间出航,并且承担一切因卖方责任而导致的延迟所产生的直接或间接的成本、费用等.
9.No underrun allowed.
9.不允许发生缺货情况.
注:以上翻译并不专业
英语翻译
英语翻译
Terms and conditions:
1.Delivery date:delivered to freight forwarder's warehouse by October 26,2009(cutoff) to meet November 2,2009 sailing date.FOB Shenzhen.Vendor will be responsible to pay for Chinese Customs clearance,trucking to the forwarder's warehouse and all origin fees including,where applicable,commodity inspection,exit inspection,A.M.S.&fees as charged by the forwarder
2.Payment term:30%deposit after pps approval,balance before delivery
4.inspection certificate issued and signed by our authorized personnel is required.
5.production can not start until pre-production samples are approved.
6.Quality Standards:
The vendor is responsible for the quality of products,and our random sample inspection does not release the vendor's responsibility to meet the quality standard we set out.The vendor is responsible for any costs,fee or change incurred as a result of inferior products.The vendor also agrees to use lead free and non-hazardous material for the production of products and lead free paint/ink for imprints and decoration of the product during production.We reserve the right to engage a third party testing company to verify if such practice is maintained in mass production and that the product is safe and meets USA ASTM standards and requirements .** will appoint third party testing company to conduct tests.
7.Vendor is responsible to get goods ready and ensure quality compliance for inspection.if goods is rejected due to non-compliance,we will charge$250USD for each additional inspection,and the charge will be deducted from the payment of goods.
8.The vendor is to ensure shipment will be made per delivery date committed above,and will be held responsible for any cost,fee or charge incurred directly or indirectly due to delay of shipment caused by the vendor.
9.No underrun allowed.
Terms and conditions:
1.Delivery date:delivered to freight forwarder's warehouse by October 26,2009(cutoff) to meet November 2,2009 sailing date.FOB Shenzhen.Vendor will be responsible to pay for Chinese Customs clearance,trucking to the forwarder's warehouse and all origin fees including,where applicable,commodity inspection,exit inspection,A.M.S.&fees as charged by the forwarder
2.Payment term:30%deposit after pps approval,balance before delivery
4.inspection certificate issued and signed by our authorized personnel is required.
5.production can not start until pre-production samples are approved.
6.Quality Standards:
The vendor is responsible for the quality of products,and our random sample inspection does not release the vendor's responsibility to meet the quality standard we set out.The vendor is responsible for any costs,fee or change incurred as a result of inferior products.The vendor also agrees to use lead free and non-hazardous material for the production of products and lead free paint/ink for imprints and decoration of the product during production.We reserve the right to engage a third party testing company to verify if such practice is maintained in mass production and that the product is safe and meets USA ASTM standards and requirements .** will appoint third party testing company to conduct tests.
7.Vendor is responsible to get goods ready and ensure quality compliance for inspection.if goods is rejected due to non-compliance,we will charge$250USD for each additional inspection,and the charge will be deducted from the payment of goods.
8.The vendor is to ensure shipment will be made per delivery date committed above,and will be held responsible for any cost,fee or charge incurred directly or indirectly due to delay of shipment caused by the vendor.
9.No underrun allowed.
英语人气:252 ℃时间:2020-01-29 07:50:01
优质解答
我来回答
类似推荐
猜你喜欢
- 1某溶液中含有SO4 CO3 OH三种离子,如果只取一次该溶液,要先检验什么,再什么,最后什么,分别加入什么试剂
- 2设A为3×2矩阵,B为2×3矩阵,( )可进行
- 312345五个数字,组成没有重复数字的五位数,其中偶数数字必须在偶数位上的共有几个
- 4现有边长为a的正方形花布,问怎样剪裁,才能得到一个面积最大的正八边形花布来做一个形状为正八边形的风筝?
- 5描写景色的成语
- 6实验小学六年级有女生84人,男生比女生多1/4,六年级人数与全校人数的比是7:36,全校有多少人?要算式
- 7四年级下册语文29课两则寓言的主要内容是什么?
- 8一间长方体房间,长5米,宽3米,它的四面墙下部1米高,(开门处1平方米不图)涂的油漆面积多少平方
- 9{(4分之一减4分之1除以二)乘13分之8加1除以6又2分之一}除以0.1 简便计算
- 10一个标有220V 100W字样的白炽灯正常工作时,其电阻是多少?通过白炽灯的电流是多大?